Planning with

In addition to an optimum cost/benefit ratio, constructors attach increasing importance to

  • short planning/construction periods
  • cost reliability right from the start
  • fast commissioning without friction losses
  • clear databases during planning and for operation

FACT meets these challenges with the following methodical and planning approaches

  • The planning time is reduced by the application of modular assemblies.
  • The modules facilitate planning and cost reliability during early planning phases. Consolidations over high
    performance scopes are possible.
  • Industrial know-how in the planning, production and commissioning phase guarantees maximum quality and low fault rates.
  • Internet-based project platform allows for consistent data documentation and availability during the planning / realization
    and operation phase ('Baulogis' or client's specific documentation).